These two pictures show the progress on the Greenbrier River
Interpretative Center. The concrete work is done and the
first coat of asphalt is down. The rest of the light fixture
needs to be mounted and the second coat of asphalt needs to
be applied. The asphalt is slow to set up because of all the
water in the ground so the second coat will not be put on
till after the 4th. We will have to rope the area off so the
current coat will not be damaged.
Thanks to everyone for their support! We still need match
money so contributions are appreciated.
|